Skip to content

Dossier

Dossier 08 — Funders

Faithful sentence-by-sentence translation of the French master text, aligned line by line; the French text remains the reference.

Master text: holding-seb-docs@a7df2793 · docs/dossiers-publics/en/08_FUNDERS.md

Download the PDFAll dossiers

Project holder: Sébastien Sanna, Geneva sole proprietorship, not registered (holding-seb-docs:docs/juridique/AIPD_ELYSEA_2026-09-30.md:37@8560b37). No sales, no revenue, no campaign results.
Identity: ethical cognitive infrastructure embeddable through an SDK. ELYSÉA is neither a companion, nor a chatbot, nor a coach, nor a therapist, nor a wellness product, nor a medical device.

Rule: no application is sent by this mission. The texts are ready for review.

DEADLINE No. 1 — Innosuisse innovation project to be filed BEFORE THE FIRST SALE. The programme targets a product “about to enter the market. Ready-developed products or services are not yet offered on the market” and requires a company “registered in the Swiss registry of commerce” [S-FIN-05]. Mandatory order: registration in the register → filing of the project (sheet F02) → first sale. A sale made before filing closes this programme.

1. Eligibility table (as of 2026-10-01)

SheetTargetSole proprietorshipBefore salesBlocking prerequisiteVerdict
F01Innosuisse Initial / Core CoachingUncertain (Q-F01-1)OK—Right now
F02Innosuisse start-up innovation projectsUncertain (Q-F02-1)Favourable: file before opening salesRegistration in the commercial registerAfter registration
F03GenilemNot specifiedBlocking (“to be in the process of commercial prospecting” (translation) [S-FIN-12])SalesAfter sales open
F04Innosuisse innovation chequeUncertain (UID)OKUID + research partnerAfter registration + lab
F05Venture KickNo for stage 3Favourable (no revenue)Academic affiliation or collaborationAfter a research collaboration
F06EIC AcceleratorA natural person may applyOKTRL 6-8 demonstratedAfter the results are published
F07FONGITSupport: yes (no need to be incorporated)OKSeed Tech: Geneva commercial register + third partySupport right now
F08FAE GenevaYes, explicitlyViability to be demonstratedRegistered domicile (commercial register)Right after registration
F09Horizon Europe Cluster 4As a partnerOKConsortium2027 call as a partner
F10AWS Activate FoundersNot specifiedOKPaid AWS accountRight now
F11EU AI PactPillar I open to allOKPillar II: evidencePillar I right now
F12MLCommonsVery small organisation: free observerOKCLARight now

Sources for each row: in each sheet (financeurs/F01…F12), all in the SOURCES.md register (S-FIN-01 to S-FIN-18, S-DRT-15).

2. Recommended order (settled)

  1. Right now, without registration: F01 Initial Coaching (after the answer to Q-F01-1), F07 FONGIT support, F10 AWS Activate Founders, F12 MLCommons observer, F11 AI Pact pillar I.
  2. Registration of the sole proprietorship in the Geneva commercial register — it also unlocks sales.
  3. Right after registration, before any sale: F02 start-up innovation project (the only programme that requires the pre-market stage); F08 FAE expert mandates.
  4. After a research collaboration (dossier 07): F04 innovation cheque (re-annotation by a lab), F05 Venture Kick (before any revenue).
  5. After the campaign results are published: F06 EIC Accelerator.
  6. After sales open: F03 Genilem.
  7. Autumn 2026 → March 2027: F09 Cluster 4 as a partner.

Conflict for Sébastien to arbitrate: F02 and F05 want a project without revenue; Genilem and FAE viability want a commercial approach. Most protective option chosen: file F02 (and F05 if a collaboration exists) before opening sales, then open sales.

Legal form: Venture Kick (stage 3), FONGIT Seed Tech and any equity investment presuppose a capital company. Decision: remain a sole proprietorship for registration (unlocks sales, FAE, F01, F10, F12); decide between Sàrl and SA at the time of a first equity offer or of Venture Kick stage 3.

3. Written questions

See financeurs/QUESTIONS_ECRITES.md (one question = one email, none is sent).

4. Documents common to every application

DocumentStateReference
Product descriptionReadyDossiers 01 and 09
Pitch deckTo be produced (visual rendering: cc web)—
Business planTo be produced—
Price gridPublishedelysea-web:src/lib/publicFacts.ts:44-56@00c9c89
Scientific protocolExistselysea-tests-e2e:audits/PROTOCOLE_CAMPAGNE_4BRAS_3TIRS_SCELLE_2026-08-28.md:3@c9898dd3
Resultsto be measured — campaign in progressholding-seb-docs:depot-zenodo-2026-09-05/RESULTATS_CAMPAGNE.md:2@8560b37
Commercial register extractDoes not exist—
IP analysise-Soleau filing (timestamp)—

Dossier sources

S-FIN-01 · S-FIN-04 · S-FIN-05 · S-FIN-07 · S-FIN-09 · S-FIN-10 · S-FIN-11 · S-FIN-12 · S-FIN-14 · S-FIN-16 · S-FIN-17 · S-FIN-18 · S-DRT-15